STAGE PROGRESS

Stage 92

When will my land be ready?

Estimated Titles due: October 2025

Estimated Settlement due: October 2025

95%

COMPLETE
Progress Key
Completed
Current
Estimated
Planned
TBC

Civil Phase

Earthworks
Completed
The process of stripping off topsoil for reuse, removal and the reshaping of the ground to allow construction of roads and surface drainage to each lot.
Sewer + Drainage
Completed
The provision of trunk sewers and reticulation of sewer pipelines and provision of a sewer connection to each lot. As well as the provision of an underground drainage system of pipes for drainage of roads and a drainage connection point to each lot.
Water + Gas
Completed
The provision of water & gas pipelines with a connection to each lot.
Kerb + Channel
Completed
Concrete construction located at the edge of a road. The kerb component acts as a barrier to prevent vehicles from leaving the road and the channel component conveys storm water from the road surface to the underground drainage system.
Footpaths, Asphalt + Topsoiling
Completed
Concrete footpaths are constructed along most road reserves within residential subdivisions. The footpaths maintain separation between pedestrians and vehicular traffic on roads. Asphalt is the road pavement constructed in layers, to provide the final sealed driving surface to a road. Topsoiling is the placement and compaction of material initially stripped from the site at the earthworks stage. It is trimmed to the final design surface levels, ready for house builders.
Eletrical + NBN
Completed
The supply of electrical cabling, street lighting & NBN (high speed internet) to each lot.

Registration Phase

Plan Registration
Estimated
The plan of subdivision is registered at Land Use Victoria, which allows new titles for each lot in the stage to be released. Settlement of each lot can then occur.
Statement of Compliance - September 2025
Estimated
A certificate issued by the Council once the subdivision is deemed to be complete and to the satisfaction of all relevant authorities.

The information represented on this stage progress page has been provided by Lotus Oaks Pty Ltd, Lotus Oaks Developments Ply Ltd & its associated entities. We have made reasonable efforts to ensure the accuracy of all details within ‘my lot progress’ is correct, however, it should be used as a general guide only. No warranty can be given by us regarding the accuracy, adequacy or completeness of any information presented. In particular, the dates displayed may change depending on a range of variable factors including, but not limited to, council building approvals and planning consent, market conditions, finance & government & municipal requirements. As a result, the information is preliminary only & subject to change without notice as the development progresses.

Simply register your details to receive the Jubilee brochure and for the Jubilee team to be in contact with you.

Special Offer

Save up to $60,000* with Jubilee’s Stack Your Savings promotion using a combination of builder discounts, developer rebates and FHB grants.

Secure your slice of Jubilee before it’s gone. *T&Cs apply.

Stack your Savings and save up to $60,000*
Building communities with heart and soul